Warning: count(): Parameter must be an array or an object that implements Countable in /home/syriaoil/www/www/english/wp-includes/post-template.php on line 284

IPR Drilling an appraisal well in Block – 24 Arrasheed contract

IPR for oil started on 30/7/2011 drilling Karam – 1 exploratory well to the south and south-west of Abu Khachab oil field province of Deir ez Zor by about 10 km, and a final scheme depth of 1160 m

,

the new well aims to evaluate the hydrocarbon potential of the formations, and transitional and Juraiba ,Debbane and cello from the age of the myosin, which proved its hydrocarbon importance through the positive results obtained in the field of Abu Khachab .

IPRMEL company began drilling exploration new well named Alchgeri 1 in Block 24 of Deir Ezzor province in an area of 3853 km 2 located to the west of Deir Ezzor by about 60 km and drilling in the eastern slope of Mount Alchgeri

IPR Company recently completed drilling operations in a well Sbkhaoi / 1 / low-Euphrates basin, which started on 10.21.2010, and noted the presence of positive indicators for evidence of hydrocarbons during drilling in a number of standards .

The Company has achieved in March 2010 on the commercial production of oil the outcome of drilling and exploration work in Block 24 Arrashid) from Jawdia formation in the installation of good fact to the north of the city of Deir Ezzor by about 17 km and formations cilo – Debbane – Juraibah in the installation of Abu Khashab , to the north-east of Deir Ezzor by about 60 km.
syria-oil

You might also like

Comments are closed.