Syrian Oil and Gaz News

to preserve the environment …. Deir Ezzor Petroleum Company compelets updating the 16-inch oil pipeline

In the context of follow-up of its operations recently Deir Ezzor Petroleum Company completed updating the 16 inches oil pipeline, through which the company export oil which were replaced in length of 17 km of pipe line at breakneck speed, and performance of high-level where the technique was used horizontal drilling to cross the line under the Euphrates River, and thus was connected to the new section of the line with the old without it stopped pumping oil through the completion of the link operation.

 


By its completion of the project, Deir Ezzor company has been implemented as planned on this side and in parallel with the implementation worked on the preservation of the environment which can be adversely affected if there is any oil spill in the path of the tube in particular that part of the line pay the Euphrates River, it is worth mentioning that mentioned line linking the station Aljfra with the main line to transport oil in the station T2.

 

Through its track the line passes through the two valve cross-sectional and point out that the company Deir Ezzor oil and during the implementation of the projects working to maintain production method actor rooted culture of action based on environmental conservation and the reduction of harmful effects as possible and so committed to the requirements of the ISO 14001 certification obtained by the company .

 

 

 

 

 

 

Syria-oil