
Syrian Oil and Gaz News
Petro-Canada oil company to discuss the drilling plan for the exploratory wells in Block 2 and Asharifah
Petro-Canada called on the sub-contractors and their representatives from the General Petroleum Corporation to attend a meeting beginning of pre-drilling exploration wells new Manda – 1 under a contract Qamishli (Block 2) as at 05/31/2010
the meeting discuss the drilling plan required for the drilling of this well and implemented successfully and without any problems, where started drilling this well, on 1 \ 6 \ 2010.
It is worth mentioning that the company Petro-Canada conducts exploratory drilling and exploration from the date 02.14.2004, where in which the survey Saesmi two-dimensional cover / 417 / km al-Helo – B of depth in 2750 and well Eldahrmat-A of the depth of 3030 m perforated variety Alchorahina Dolomite, and began the first phase of extension for a period of exploration on 13/2/2008 for 30 months, “where they are currently preparing to drill a well Manda – A.
President Bashar al-Assad in the twenty-second of April inaugurated gas plant Ebla in the Alfrqls in Homs governorate, which was carried out by Petrofac for the Petro-Canada has a production capacity of 2.5 million cubic meters of clean gas per day and working draft of Ebla to exploit gas reserves of 500 billion cubic feet.
Snkur Energy’s largest oil and gas company production accounted for the Canadian Petro-Canada last year and took over the management of the development.
Syria-oil
انقر هنا للطباعة