assessment well drilled in the field of Abu Khashab by Arrashid Petroleum Company

Category: joint ventures News | Posted on: 6-06-2011

Arrashid Company has started l drilling Assessment Abu Khashab-3 well, with a final planned depth of 1150  Meter , to evaluate the configurations of formulation of Transition and Juraiba ,Debbane and cello from the age of mucin, which proved important hydrocarbon through the positive results that were obtained by drilling wells Abu Khashab – 1 and 2 and south of Abu Khashab – 1.

 


IPRMEL company began drilling exploration new well named Alchgeri 1 in Block 24 of Deir Ezzor province in an area of 3853 km 2 located to the west of Deir Ezzor by about 60 km and drilling in the eastern slope of Mount Alchgeri

 

IPR Company recently completed drilling operations in a well Sbkhaoi / 1 / low-Euphrates basin, which started on 10.21.2010, and noted the presence of positive indicators for evidence of hydrocarbons during drilling in a number of standards .

 

The Company has achieved in March 2010 on the commercial production of oil the outcome of drilling and exploration work in Block 24 Arrashid) from Jawdia formation in the installation of good fact to the north of the city of Deir Ezzor by about 17 km and formations cilo – Debbane – Juraibah in the installation of Abu Khashab , to the north-east of Deir Ezzor by about 60 km.

syria-oil


Print This Post Print This Post


Comments are closed.